Understanding the Pre-Construction Process

The first step, or set of steps, for any commercial, multi-family, or residential project, is the pre-construction process. During the pre-construction phase, before construction begins, much of the planning and essential work happens. 

Usually pre-construction meetings take place involving the owner, project manager, architect, general contractor, and project manager.  During these meetings the following are often discussed and decided on.

Defining the scope of work, Design/Development: including scheduling necessary tests (soil tests, for example) or pulling required permits, understanding the overall objectives of the project.

Costs and Schedule Management: This covers scheduling of subcontractors, estimated and actual costs, managing timelines for the project, and understanding risk management. 

Team Assembly is crucial to any good project: having a reliable team in place, including subcontractors, vendors, designers, and assistants, can make all the difference. 

Site Prep like getting an area graded and utilities set up, and setting up temporary offices, bathroom facilities, etc are the last step before a project actually begins. This means we’re ready to get started with the physical work of your new construction or remodel project! 

Design Build vs. Traditional: Which is right for you?

When it comes to bringing your commercial construction project to life, you have two basic methods to choose from: a traditional (design-bid-build) method or a design build method. Each has its benefits and drawbacks, and deciding which is the best way to go will be up to you and your individual preferences.

Design Build

A “design build” method means that your contractor is in charge of everything: the design and the build. At North Peak we use this method and work with our architects, subcontractors, vendors and the owner as a team, from the very beginning of the project.

With a design build, you’re trusting your contractor to choose all of those other aspects: vendors, architects, etc. You’re allowing the contract to have most of the control, leaving you to just relax and wait for your finished project!

For some, this lack of control can be unpleasant. While it can save time and streamline processes, if you want to be more involved in various aspects of your project, a traditional method might be better for you.

Traditional Build

With a traditional build, also called a design-bid-build, you will choose your architect first. Once your architect has designed your project you can then have contractors bid on your project.

This also means you will become the go-between and main communicator between the architect and general contractor. You’ll be in charge of making more decisions in regards to your commercial project.